Specifications include, but are not limited to: maintenance and protection of vehicular and pedestrian traffic; coordination / scheduling of all work, site clearing and grading operations; cutting and removal of existing trees; storm sewer and roof drainage system improvements; repair and reconstruction of various types of 10 existing storm sewer inlet / manhole structures; construction of various types of new storm sewer inlet structures; furnishing and installation of new parking area lighting facilities and other specified electrical improvements including light poles, various types of light fixtures; concrete foundations, where required; PVC conduit, handholes, wiring, connections; posts and mounts; various types of receptacles, circuit breakers, transformers, switches, equipment, modifications to existing panelboards; testing / commissioning and all other electrical appurtenances; removal of approximately 500 lineal feet +/- of existing concrete curb, removal of approximately 1,500 square feet +/- of existing concrete sidewalk; construction of approximately 1,400 lineal feet +/- of new standard Borough concrete curb; construction of approximately 3,200 square feet +/- of new standard Borough 4" thick concrete sidewalk; furnishing and installation of cast-in-place handicapped sidewalk ramp delineation.