Specifications include, but are not limited to: 1.Prepare necessary documents to obtain any permits required by the City of Trenton and, if necessary, required by any other jurisdictional agency and/or NJDEP. The consultant shall perform further hydraulic studies on the Delaware River in the area around the Intake at various flow conditions and intake withdrawal rates. This shall be done to generate a hydraulic profile which may be used to determine improvement options. Hydraulic modelling shall be performed to identify how the sediment, debris, etc. flow and are affected by the intake. 2.Prepare necessary documents to obtain any permits required by the City of Trenton and, if necessary, required by any other jurisdictional agency and/or NJDEP. 3.The consultant shall assemble additional data on the Delaware River in the area of the intake showing historical low, medium, and high flow conditions for: a.CFS b.Velocity (feet per second) c.Gauge height 4.The consultant shall further review the types of materials that flow down the river and could potentially affect the intake, bar racks, screenings, appurtenances, etc. and any design improvements.