Specifications include, but are not limited to: Supply and install one new oil fired furnace, new oil booster pump for new oil, and all control interlock from pump to furnace, the same as manufacturer(s) and/or model(s) indicated in this bid or equivalent to the type and quality required. • State of NH to provide all electrical power wiring needed for the new booster pump and oil furnace • Replace existing vent stack with new product • Clean all existing duct work • Add new ductwork as needed to connect new furnace to the existing ductwork • Replace all existing 6” flexible duct with hard duct. • Remove existing flex duct run to new break room and replace with hard duct and add new supply diffusers for the space • Add a filtered return boot to new furnace to keep return air off the floor • Install end cap at end of main truck duct • Supply and install new programmable thermostat