Specifications include, but are not limited to: install, own,
operate, maintain and furnish the City with electricity from solar photovoltaic energy systems (Solar
PV Systems) at the City-owned parcels under a Solar Power Purchase Agreement (SPPA), which:
(1) has a total peak generating capacity greater than 100 kilowatts (kW) up to and including one (1)
megawatt (MW) for an initial term not to exceed twenty (20) years; or (2) dependent on pending
legislation described below, which has a maximum rated capacity of less than five (5) megawatts
for an initial term not to exceed twenty (20) years.