Specifications include, but are not limited to: 1)Executive Summary.Prepare an executive summary of the Facility Plan.2)Description of the Wastewater Treatment Facility.Describe the general background of the City and the existing wastewater treatment plant along with basic information on the current service area.3)Planning Data.Describe the City’s current and projected population, sewage flows and loading. Describe the City’s sewer service area and City limits at the time of the plan preparation.4)NPDES Permit.Discuss the City’s existing NPDES discharge permit, draft NPDES discharge permit,potential future regulatory issues, compliance strategies, and TMDL considerations. Examine the potential impacts of New Hampshire becoming a delegated state and issuing future NPDES permits.5)Treatment Capacity and Condition Assessment.Assess design criteria, plant performance capacity,capacity limitations, and reliability and redundancy requirements.6)Reliability and Redundancy Evaluation.Perform an evaluation of the reliability and redundancy of key processes within the NWTF as currently operated. Provide recommendations and estimated costs for reliability and redundancy improvements.