Specifications include, but are not limited to: Providing a phased work plan for the removal of asbestos containing materials, including but not limited to boiler and heating pipe insulation, mastics, floor tiles, etc. The contractor shall: a. Provide all necessary documents for permits and notification. b. Provide a recommendation for containment of the work area, required ventilation, and the decontamination process. c. Recommend any and all OSHA requirements for effective worker safety. d. Provide alternatives for the safe removal of mastic that will minimize effects to other parts of the building (e.g., low VOC solvents). e. Provide all testing required to verify suspect asbestos containing materials. f. Periodically monitor the work for compliance with the work plan. g. Perform all required clearance testing. h. Visually inspect completed work for thoroughness.