Specifications include, but are not limited to: The proposed plan is to implement a fully Adaptive Signal Control (ASC) system on Granite Street where cycle lengths, phasing, offsets, and splits are continuously monitored and updated to provide optimized timing for current traffic operations. On South Willow Street, communication between signals will be upgraded and where effective, Signal Performance Measures (SPM) will be utilized to maintain fixed cycle lengths but continually adjust splits and offsets. Consultants will be required to conduct a physical inventory of the site, as well as conduct topographic surveys as necessary, prepare systems engineering documentation for adaptive technology, prepare design/engineering plans, prepare NEPA documentation, obtain permits (such as Alteration of Terrain and Wetlands encroachment) and easements and produce contract documents for public bid.