Specifications include, but are not limited to: 1) Complete a draft Site Specific Project Plan (SSPP) to cover pollutant load reduction modelling attributable to the BMPs and submit to FSPOA for review. 2) Complete the final SSPP incorporating responses to any FSPOA comments, including those received from NHDES, and submit the revised version to FSPOA. 3) Complete design concepts for the Four Seasons BMPs (BMP types described in the Executive Summary); complete surveys, investigations, test pits, or other activities necessary to determine the suitability of those concepts for construction. Provide brief summary report of this examination and findings for review by FSPOA and NHDES. 4) Revise the BMP design concepts based upon input from FSPOA.