Specifications include, but are not limited to: The Townsite Phase I project generally includes the installation of approximately 10,250 linear feet (LF) of 8-inch water pipe and the following lengths of sewer, approximately 4,606 LF of 8-inch, 261 LF of 10-inch, 3,712 LF of 12-inch, and 3,258 LF of 15-inch sewer pipe, installation of fire hydrants coating of existing sewer MHs, trenching, compaction, asphalt paving, storm drain and inlets, traffic control, coordination with other agencies specifically with NVE during installation of their overhead facilities, SWG, and coordination with the City of Henderson Field Operations for shut downs. Coordination with the residents for installation of water and sewer laterals, from back yards to the front of the homes and connection to the water and sewer in the public street, sewer bypass pumping, and other improvement items as shown on the bid schedule, drawings and specified in the bid documents.