Loading...
Skip to main content
< Back to results

Passenger Boarding Bridge Replacement Project


Location
Nevada
Publication Date
02/26/2019 04:31 PM EST
Closing Date
03/21/2019 05:00 PM EDT
Issuing Organization
Reno-Tahoe Airport Authority (RTAA)
Solicitation Number
Description

Specifications include, but are not limited to: In accordance with the plans and specifications, the project consists of a phased replacement of six (6) passenger boarding bridges (PBB) at the Reno-Tahoe International Airport. Two (2) of the PBBs are located on the B-Concourse and the Four (4) of the PBBs are located on the C-Concourse. The scope of work includes the procurement and installation of the new PBBs, as well as the removal and reinstallation of various pieces of existing equipment, including but not limited to, pre-conditioned air units and ground power units. In addition the scope includes, installation of associated data cabling inside the concourses, removal of existing gate envelope striping, and reinstallation of new gate envelope striping at all six (6) associated gates.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids