Specifications include, but are not limited to: he Work includes the rehabilitation of the following five lift stations: Metro I & II, Casa Buena, Regency and Highland. Rehabilitation of Metro I & II Lift Stations will include: removal and replacement of the existing pumps with chopper pumps; removal and replacement of all electrical wiring, conduit, panels and enclosures; the Metro I Lift Station includes removal of existing 6-inch asbestos cement pipe force main and Metro II Lift Station includes removal of existing 4-inch asbestos cement pipe force main and replacement with new 4-inch to 6-inch C900 PVC dual force mains; and, it includes adding cleanouts to the existing Regency Lift Station Force Main. Work includes rehabilitation or replacement of associated manholes, wet wells and lift station dry pit. Construction includes pavement restoration, traffic control, bypass pumping and all other appurtenant work