Specifications include, but are not limited to: 1. Contractor to provide all repairs in accordance with the Contract Drawings and Specifications prepared by McElhaney Structural Engineers dated 08/08/2019 and RHA plans and Specifications dated 08/28/2019. 2. All work to be performed as required by all applicable building codes. 3. All structural repairs to be performed in strict accordance with the plans and specifications. 4. Contractor is responsible for obtaining all permits required. 5. Contractor will be required to provide a building final and certificate of occupancy prior to release and final payment. 6. During the demolition of the existing walls and floors if there is evidence of water damaged or rotten plywood or framing members in units not identified on the Structural Plans, contractor will immediately notify RHA.