Specifications include, but are not limited to: The City is seeking proposals from Respondents to lease property from the City for the utility-scale renewable energy facility. The objective of the City in issuing the RFP is to aid and encourage the development of new low-water using or reclaimed water using renewable energy generation technologies as well as to continue the expansion of renewable energy resources within the Eldorado Valley. Wind has also been identified as potentially viable at this location, as has subterranean compressed air technology. The City has the ability to enter into a long-term lease for the use of the city property for the generation of electricity. A utility-scale photovoltaic or other low water generation technology is the anticipated development on this site. Preference will be given to those proposals that include energy storage as part of their project. 3.1.1 Suitability of Site. It is the responsibility of the Respondent to determine the adequacy of the site. The Respondent shall use the documentation provided through this RFP and other field evaluation to make their determination regarding the site’s soil, rock and subsurface conditions, including, but not limited to the potential for flooding, to determine the suitability of the site for the planned usage. Respondent assumes all risk resulting in any change in conditions that may occur during the progress of the work or implementation of the contract. The City shall have no responsibility under or in implementation of the contract ultimately executed for insufficient data or incorrectly assumed conditions concerning the character of the site or the nature of the work to be done under the executed contract. However, the City will cooperate with Respondent to obtain information relating to these matters including making available applicable records in the City’s possession. 3.1.2 Respondent to perform their own examination. The Respondent shall perform its own examination and research required by this RFP, the proper method of doing the work and all conditions affecting the work to be done, and the labor, equipment, and materials needed thereon, and the quality of the work to be performed. The Respondent shall assume responsibility to become knowledgeable regarding all such conditions, and that Respondent’s conclusion to submit a proposal is based upon such investigations and research regarding all such conditions, and that Respondent shall have and make no claim against the City because of any estimates, statements, or interpretations made by an officer or agent of the City which may prove to be in any respect in error or erroneous.