Specifications include, but are not limited to: Installation of approximately 13,203 linear feet of new 6-inch, 8-inch, 12-inch, 15-inch, 21-inch, and 24-inch diameter sewer pipes and 56 manholes in 48-inch, 60-inch, and 72- inch diameter sizes. The pipelines will be constructed using open-cut methods. Construction includes new sewer pipes; reconnection of existing sewers and service laterals; bypass pumping; traffic control; street restoration; water pipe relocations; and all other appurtenant work.