Specifications include, but are not limited to: phased remodeling of an interior space with the phases designed to permit the continuously occupied Airport Communications Center to maintain functionality. The project will include the modification of the building perimeter walls to add/modify doors/windows. The project will replace HVAC systems and modify existing electrical systems. The project will also include technology systems work such as security, audio/visual, data cabling and compute infrastructure. The interior fit out will include the replacement of lay-in ceilings, construction and painting of partitions/doors and installation of flooring and the renovation of a kitchenette in the break room. The project is approximately 4020 square feet, located in the AVA building off of Vassar St. at the Reno-Tahoe International Airport.