Specifications include, but are not limited to: The Work provides for upgrading electrical feeders and existing equipment, add new electrical equipment (transformers, service pedestals, power panels, receptacles), remove existing power feed from Well 81 MCC and connect to existing South Gardens Switchboard “GS1”. This Work provides a significant increase in receptacles to support the expanded gardens public and private events power requirements. Most existing GFCI receptacles will be replaced with new duplex GFCI metal bollards. All new receptacles will be connected to new power sources (pedestal or panel) and the existing wiring removed back to the source. Existing conduit will be mostly abandoned in-place if not used. The existing wiring and conduit/pullbox infrastructure routing, as well as some load source power panels, is unknown and the contractor will have to identify the equipment, conduit, and pullboxes to successfully remove the existing/old wiring.