Specifications include, but are not limited to: GROUP 8 SPECIALTY 0001 0001.08 BARRICADE, TYPE II 1750.000 BDAY 0002 0001.10 BARRICADE, TYPE III 192.000 BDAY 0003 0001.90 SIGN DAY 11458.000 EACH 0004 0002.45 TEMPORARY BROKEN LINES 1840.608 STA 0005 0002.60 OVERLAY SOLID LINES 3681.216 STA 0006 0003.10 FLAGGING 70.000 DAY 0007 0003.20 FURNISHING AND OPERATING PILOT VEHICLE 35.000 DAY 0008 0020.00 TRAINING 100.000 HOUR 0009 0030.80 MOBILIZATION 1.000 LUMP 0010 7495.54 5" PERMANENT PAVEMENT MARKING PAINT 426000.000 LF 0011 8008.50 AGGREGATE FOR MICROSURFACING 7190.000 TON 0012 8070.05 MINERAL FILLER FOR MICROSURFACING 150.000 TON 0013 9009.15 MICROSURFACING PLACEMENT 1838.428 STA 0014 9052.10 EMULSIFIED ASPHALT FOR MICROSURFACING 247100.000 GAL 0015 9053.20 FOG SEAL 39270.000 GAL 0016 L860.50 ENVIRONMENTAL COMMITMENTS - CONTRACTOR COMPLIANCE 1.000 LUMP