Specifications include, but are not limited to: All on-site personnel will attend site standard safety training. All on-site personnel must attend a daily Job Brief safety meeting to review possible hazards associated with the project as well as any precautionary measures that may need to be taken to ensure all work will be performed in accordance with the Contractor’s safety practices and procedures. All work must be completed under a valid hot-work permit. Failure to request and follow the site hot-work procedures will result in a removal from site. Contractor will be briefed on a Covid-19 specific safety requirements closer to work. Failure to adhere to these requirements will result in a removal from site. Tank Stands Contractor to provide (2) tank stands. One per tank. Each stand will be made out of 304 stainless Both plates of stand will be ¾” thick Due to cold growth in the tank, each stand will be built 4” larger than tank diameter.