Specifications include, but are not limited to: Pavement construction and reconstruction shall include all necessary removal of existing headers, pavement, sidewalks and drives; clearing, grubbing and stripping, excavation within the limits of the Work, removal of obstructions, removal and disposal of unsuitable material and debris, borrow excavation, construction of fills and embankments, haul, preparation and compaction of the subgrade; the construction of curbs, base, pavement, driveways, sidewalks; trimming, shaping and finishing of the parking space; excavation of ditches, grading and construction of approaches on intersecting or entering streets, alleys, driveways, and any other items of Work necessary to conform to these Standard Specifications and the lines, grades and cross sections shown on the plans, all as directed by the City’s Project Manager.