Specifications include, but are not limited to: The proposal will include material, labor and equipment to construct the new splash pad including: water play features, infill, crushed rock base, concrete deck surface, above grade cabinet controller, mechanical system, backflow preventer, drain lines, water lines, and electrical. • Contractor shall include material, labor and equipment to construct the splash pad and prepare the subgrade. • City staff will supply the site with water and waste connections on the property as specified on the site plan. • Contractor shall connect to the fitting, which will be sized appropriately, to the water service that will be constructed by the City within five feet of the splash pad control box as specified on site plan. • Contractor shall connect to a 6-inch PVC storm sewer line that will be constructed by the City to the drain location of the splash pad as specified on the site plan. • Contractor shall be responsible for all electrical work. This will include, but may not be limited to, installation of appropriate breaker(s) at the service panel, runs of conductor inside conduit from the panel to all energized devices and all electrical connections and other electrical work up through final inspection by City of Kearney Building Inspector(s) per local Code. (see site plan for location of existing electrical service panel). • Contractor shall assume all responsibility for obtaining and verifying measurements. • Contractor shall work with City staff to keep disruption of park grounds to a minimum. Trenches shall be backfilled and tamped by Contractor. • Contractor must provide safety fencing, minimum 4’ high, around the perimeter of the splash pad construction area. • Contractor must protect and monitor poured concrete until it is cured. Contractor shall be responsible for removal, and replacement, of concrete if vandalized prior to completion of entire job. • Underground Utility Locations: The Contractor is required to call Digger’s Hotline to locate all utilities prior to construction. • Contractor shall be responsible for backfilling and rough grading around the splash pad and any areas disrupted. City shall be responsible for the finish grading and turf/irrigation restoration