Specifications include, but are not limited to: 5.1 Demolition and Removal of Asbestos Material located in Mechanical Room 5.1.1 Demo and remove asbestos material Pipe Wrap Insulation. 5.2 Demolition and Removal of Asbestos Material located in Tenant areas 5.2.1 Demo and Remove of Mastic under tile in tenant areas. 5.2.2 Demo and Remove of floor tile in tenant areas. 5.3 Demolition will be completed in Two (2) Phases. Phase 1all EXPOSED asbestos containing material, Phase 2 Above ceiling in tenant areas not visible before wall and ceiling demo. 5.4 Any deviation from the bid documents which may arise during construction must be addressed and approved by the Project Manager and Owner’s Representative prior to completion of work, with a contract amendment being issued as necessary. 5.5 The Vendor is responsible for obtaining and paying of all fees and charges associated with permits or licenses required to complete the work for this project. 5.6 Vendors will be given a location to park vehicles and stage equipment during the term of the project.