Specifications include, but are not limited to: the installation of new roofing system, remove and dispose of existing roof system down to roof deck. Wire brush and clean all flashing surfaces on roof edges, walls, curbs, stacks, and protrusions. Remove all debris from roof. Install two (2) layers of 2” Polyiso Insulation. Install mechanically fastened 50-MIL Duro-Last Single Ply Roofing System, with a manufacturer’s 15-Year Material and Labor Warranty and Ten Million Dollar Product Liability Insurance. Wrap membrane up parapet walls, over roof edges, and install 7” 2pc compression metal in owner’s choice of color. Install pre-fabricated Duro-Last flashing and accessories at all walls, curbs, stacks, and ppagerotrusions, as per Duro-Last’s design and specifications.