Specifications include, but are not limited to: The Contractor shall supply and install a Class IV full structural CIPP liner in accordance with AWWA M28, including removals, sawcutting, dewatering and water management, excavation, vertical shoring, access pits, disposal of material and excavated earth, cutting the watermain, measuring watermain dimensions (including inside and outside diameters), replacement of tees/crosses/fittings/bends, cleaning and preparing the watermain, grinding of service taps, disposal of water and waste products from cleaning operations, installing and curing the CIPP lining, reinstatement of all water services, chlorination and disinfection, cathodic protection, jumper and tracer wires, pressure testing, flushing, new watermain pipe within access pits, bedding, backfilling, restoration (where not covered by other items of the Contract), site clean-up and all other incidental work and services.