Specifications include, but are not limited to: 0001 0030.10 MOBILIZATION 1.000 LUMP 0002 1000.00 LARGE TREE REMOVAL 4.000 EACH 0003 1009.00 GENERAL CLEARING AND GRUBBING 1.000 LUMP 0004 1010.01 EXCAVATION (ESTABLISHED QUANTITY) 5141.000 CY 0005 1011.00 WATER 30.000 MGAL 0006 1031.00 ROCK RIPRAP, TYPE B 25.000 TON 0007 1136.01 REMOVE SHEET PILE WALL 1.000 EACH 0008 1701.24 24" DRIVEWAY CULVERT PIPE, TYPE 2,3,4,5,6,7 OR 8 42.000 LF 0009 4049.75 OUTLET STRUCTURE AT STATION 19+81.00 LT. 1.000 EACH 0010 4049.76 OUTLET STRUCTURE AT STATION 19+69.00 RT. 1.000 EACH 0011 4050.01 EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS 529.000 CY 0012 4100.06 CLASS 47B-3000 CONCRETE FOR HEADWALL 46.100 CY 0013 4150.00 REINFORCING STEEL FOR HEADWALL 6140.000 LB 0014 4900.56 ADJUST DRAIN TILE TO GRADE 1.000 EACH 0015 L006.00 COVER CROP SEEDING 1.000 ACRE 0016 P300.30 30" CULVERT PIPE, TYPE 3,4 OR 5 57.000 LF 0017 P300.60 60" CULVERT PIPE, TYPE 3,4 OR 5 114.000 LF