Specifications include, but are not limited to: 1 Mobilization a) 2020 Construction 1 L.S. b) 2021 Construction 1 L.S. 2 Traffic Control a) Phase 1 1 L.S. a) Phase 2 1 L.S. a) Phase 3 1 L.S. a) Phase 4 1 L.S. a) Phase 5 1 L.S. a) Phase 6 1 L.S. 3 Remove & Haul Pavement 20000 S.Y. 4 Remove & Haul Driveway 1000 S.Y. 5 Remove & Haul Sidewalk 27000 S.F. 6 Remove & Haul Inlet 27 L.F. 7 Remove & Haul Storm Sewer Pipe 600 L.F. 8 Remove & Haul Temporary Pavement 750 S.Y. 9 Remove & Haul Curb & Gutter Section 100 L.F. 10 Common Excavation, Established Quantity (E.Q.) 6500 C.Y. 11 Overexcavate & Replace Unsuitable Base Material with Crushed Concrete 500 C.Y. 12 Construct 6" Thick Crushed Concrete Foundation Course 23100 S.Y. 13 Construct 8" Thick P.C. Concrete Pavement, Type 47B-3500 20750 S.Y. 14 Construct 8" Thick High Early Strength P.C. Concrete Pavement, Type 47B-HE-3500 250 S.Y.