Specifications include, but are not limited to: Latrine and septic pumping will be done on an “As Needed” basis; the specific number and location of the latrines to be pumped will be determined by FWP. Visitor usage will determine the actual number of visits needed to be made by the contractor. There will be no guarantee as to number of visits or total contract amount. Response time for the pumping must be no more than five (5) days after notification. Failure of the contractor to perform within five (5) days after notification for pumping places the contractor in default and FWP, at its sole discretion, may retain any other available septic contractor to perform the service. All trash must be removed from the vaults and properly disposed of, off site by the contractor. Latrine pumping must be done at the rear hatch openings whenever possible. FWP will furnish a key for this access. If pumping is required by removing the interior riser the contractor must take care in removing the riser and protect the seat cover from being damaged or scratched. contractor will be responsible to replace any seat or riser that is damaged during this removal. The solids and liquid level must be pumped out as low as possible so that no more than four inches or less of liquid remains in each vault or septic. This may require the contractor to back flush the vaults so all solids are removed.