Specifications include, but are not limited to: Each month measure, record on provided data sheets and submit data to Department of Natural Resources (DNRC) and FWP for the following: dam monitoring wells, spill gate opening, reservoir elevation, Wyman drain field wells and Wyman manholes. ; Notify the DNRC and FWP of unusual occurrences such as impending floods, high water levels, low water levels, earthquakes, slumping surfaces, sinkholes, damage to facilities or excessive seepage. Notify the DNRC & FWP when spring runoff flows have peaked. Monitor the weather through local forecasts and National Weather Service as it affects water levels in the reservoir. Provide timely spill gate adjustments during significant precipitation or flood events. Execute the Gartside Dam Emergency Action Plan (EAP) if it appears the dam is in jeopardy of flooding or failing.