Train Car Porch
22'x10' plus steps to code.
o All decking, railing and fascia boards will be commercial grade composite material.
o Permits required and inspections at no charge to the vendor.
o Wood sub-frame
o Steps build to code all composite deck, railing and any other areas that are not sub frame.
3'x3' plus steps to code.
o All decking, railing and fascia boards will be commercial grade composite material.
o Permits required and inspections at no charge to the vendor.
o Wood sub-frame
o Steps build to code all composite deck, railing and any other areas that are not sub frame.
Church Porch
Remove old deck boards, railing system and fascia board
Replace any damaged or rotted sub-frame add additional decking support/cross bracing if needed to ensure no sag when the new deck is installed.
Install commercial grade composite decking color options needed, Install commercial grade composite railing system and commercial grade composite fascia board.
Steps to be installed as they are now all commercial grade composite deck/railing system.
We want it to look classic and a manner that fits the time period not modern. We will discuss options with potential bidders.
Working area must be kept clean and secure
Town Hall
Replace 2 porches south porch needs to be handicap both porches must be composite material vinyl railing.
School House
Replace both porches composite material and vinyl railing.
Taylor Historical Museum
East Porch Remove decking, reuse structure and add if needed. Re-deck with composite.
Train Station
Repair or replace pouch with composite material.
Replace railing with composite or vinyl
For all jobs all material and debris will be disposed of by contractor.
Permits must be pulled. No charge for the permits and inspections