Description of Work
Division No. 1 Parking, Ballfield and walkways:
Work for this division consists of; clearing, soil erosion measures, earthwork, site grading, 6” gravel parking lot, walkways consisting of 2” crushed limestone fines over 4” crushed limestone, 6” reinforced concrete parking for ADA parking, boulder retaining walls, rain gardens, parking lot striping, baseball fields with base systems and infield/outfield material, chain link backstops, 4” concrete dugouts with aluminum benches, gates and chain link fencing (varied heights), outfield fencing with protection, plastic recycled site benches, parking and identification signage, plastic recycled trash and recycle bins.
Division No. 2 Parking, Basketball Volleyball Court and walkways:
Work for this division consists of; clearing and grubbing, soil erosion measures, earthwork, site grading, 6” 21AA gravel parking lot, walkways consisting of 2” crushed limestone fines over 4” crushed limestone, 6” reinforced concrete parking for ADA parking, ADA signage, parking lot striping, 1-4” reinforced concrete basketball court with backboard system and court striping, 4-sand volleyball courts (15” deep) with nets/systems, plastic recycled benches, picnic tables, trash and recycle bins, and solar light poles.