Loading...
Skip to main content

Basic Information

Reference Number

0000210372

Issuing Organization

Charter Township of White Lake

Project Type

ITB - Invitation to Bid (Formal)

Project Number

19150

Title

SETTLER'S POINTE DENTENSION BASIN REMEDIATION

Source ID

PU.AG.USA.1883.C6020301

Details

Location

United States, Michigan, Oakland County

Piggyback Contract

No

Dates

Publication

03/11/2019 10:53 AM EDT

Question Acceptance Deadline

03/25/2019 12:00 AM EDT

Questions are submitted online

No

Closing Date

03/29/2019 02:00 PM EDT

Contact Information

Dawn Bockelman

248-698-3300 ext. 111

dbockelman@whitelaketwp.com

Description

This project involves the removal of trees, excavation of accumulated sediment, re‐grading of slopes, and implementation of necessary Soil Erosion and Sedimentation Control measures in and around the easterly 2 Detention Basins (Basin 1 and Basin 2) of SETTLER'S POINTE Park in White Lake Township . The existing outlet structures of Basin 1 and Basin 2 are to be removed and new detention basin outlet structures installed in the Basins. The existing outlet pipe of Basin 2 shall be trimmed by 4'. Basin side slopes are being re‐graded to the proposed elevations and restored with topsoil, seed and mulch blanket.

See more

Bid Submission Process

Bid Submission Type

Physical Bid Submission