Specifications include, but are not limited to: 1. The contractor shall supply all dumpsters as listed on Exhibit A unless otherwise instructed by the University. 1.1 The location for each dumpster shall be established by the University and is subject to change. 1.2 All dumpsters must be maintained by the contractor in a good, clean condition at all times. The trash dumpsters must be deodorized and disinfected as requested, either on site or by actual replacement at no additional charge to the University. 1.3 The University will determine which dumpsters will be open-tops and/or which must have lids. 1.4 The contractor shall maintain ownership of all dumpsters unless otherwise specified. 2. The contractor shall provide trash pick-ups as listed on Exhibit A. The University reserves the right to change the number of pickups at each location, depending on need. In addition, the contractor must also provide unscheduled pick-ups on an as needed, if needed, basis. 2.1 The University makes no guarantee of a minimum or maximum number of additional pick-ups that will be required. 1. The University prefers a single-stream recycling program. Single-stream recycling allows for all recyclable tems to be mixed together during the collection stage and sorted off-site. The recycling program will not include glass or items considered electronic waste such as computers, printers, scanners, etc. However, the following items must be included: 1.1 Mixed paper 1.2 Cardboard 1.3 Aluminum 1.4 Plastic bottles 1.5 Steel cans 2. The recycling program should include the University’s main campus, River Campus, and the Regional Education Center located in Sikeston.