Specifications include, but are not limited to: The main scope of work for this project is for transformer “services, including but not limited to: oil processing to dry out and remove contaminants if necessary to maintain less than (<)0.085% Moisture by Dry Weight and/or <8% Saturation and/or <10 PPM to ensure highest electrical properties; Type-U Bushing replacement; repair; gasketing; and testing. The work shall be for refurbishment of the following Ten (10) Substation, Power Plant, and Fellows Lake Transformers: Mill (North) Auto Transformer, Mill (South) Auto Transformer, JRPS (South) Auto Transformer, Brookline (South) Auto Transformer, JTEC #2 GSU Transformer, JTEC #1 GSU Transformer, JTEC (Gas Turbines) GSU Transformer, JRPS Gas Turbine #2 GSU Transformer, JRPS Gas Turbine #1 GSU Transformer, Fellow Lake Transformer. Various Transformers have been determined to contain too much moisture for satisfactory on-going operation. Transformers may have cracks &/or gaskets &/or valves &/or radiators that leak oil and need repaired. Some transformers have GE Type-U bushings that will need to be replaced.