Specifications include, but are not limited to: (a) removal and disposal of existing switchgear, “switchgear/transformer/oil containment” foundation and miscellaneous conduits and cables; (b) installation of new foundations and piers; many underground conduits and above grade conduits; pull boxes; many new cables and wires; 13.2kV main and four feeder circuit breakers; 69kV circuit switcher; crushed rock surfacing; ground grid additions and above grade grounds on structures, equipment, and cabinets; all above grade structures; control cabinets, V.T.’s, CPT’s, batteries and rack, charger, outdoor relay cabinet #4; and electrical connections; (c) erection of all new structures and associated equipment, (d) testing and commissioning verifications for equipment and wiring Contractor installs {except for Relay Panel #4 protection/control, interfaces to CU’s SCADA and communication systems}, and (e) the restoration of any damage caused by the construction work at the City Utilities’ North Highway 13 Substation site at 3204 N. Kansas (Farm Road 143) in Springfield, Missouri.