Specifications include, but are not limited to: a project to provide new regional incineration facilities at wastewater treatment facilities. 1.1.1 Screw press 1.1.2 Sludge pumping equipment for screw press feed 1.1.3 Polymer make-up and feed equipment 1.1.4 Dewatered sludge conveyance equipment for transfer of dewatered sludge from screw press to the Belt Filter Press 6 dewatered sludge discharge 1.1.5 All screw press system electrical controls, starters, and instruments 1.1.6 Manufacturer’s recommended spare parts to be provided at equipment start-up 1.1.7 Design and configuration of screw press pilot system to insure suitable operation, feed, drain, utility connections and conveyance of dewatered sludge 1.1.8 Operator training for screw press equipment 1.1.9 Manufacturer start-up services for screw press system 1.1.10 Manufacturer technical support during pilot test period (3 - 12 months)