Specifications include, but are not limited to: • Bid per photo below • Set up a controlled access zone around work area with barricades and caution tape to create a safe work zone. • Erect scaffolding up to and including 3rd floor window (per photo). • Remove downspout and reinstall at completion of project. • Repoint all brickwork solid, removing a ½ inch minimum of existing mortar, from column to column as defined in photo. • After mortar has cured, clean all new work with industry standard cleaning agent. • After brickwork has thoroughly dried, apply industry standard water repellent/sealer to newly tuckpointed brickwork. • Mortar shall be type “N” with color and profile to match existing, as close as possible.