Specifications include, but are not limited to: Supply and install ADA rumble strips on the asphalt at all public crossings for the Zooline RR. The contractor shall be responsible for supplying all products to do this work, milling asphalt to install the pads flush and based on manufactures guides and warranty work based on normal wear and tear based on vehicle and pedestrian traffic for a period of 5 years. The amount of material and the locations of work are listed below, coverage shall be between 2 to 3 feet deep and on both sides of the rail. Length distances will be specified as North, South, East, West or Both if the distances on both sides of the rail are equal. South Gate River’s Edge Crossing-20ft both South Entrance Crossing-16ft both Animal Nutrition Crossing-12ft both Cobra Crossing (in River’s Edge)-13ft both Insectarium Crossing-26ft north 32ft south Living World Crossing-23ft north 18ft south Grizzly Crossing-42ft north 22ft south Polar Bear Crossing-22ft north 20ft south Carousel Crossing-22ft south 24ft north 4D Theater Crossing-18ft west 21ft east