Specifications include, but are not limited to: Provide and deliver 3,120 square yards of sod to Queeny County Park. Sod will be delivered and off loaded in rolls. The awarded contractor will provide a sod installer piece of equipment so the County personnel can do the installation of the sod. New Fescue Sod will be on rolls 30”wide x 108’ long consisting of 30 square yards. Time Limitations: Under optimal conditions, sod shall be harvested and delivered within a period 36 hours. However, because sod is a perishable commodity, if high temperatures and low moisture extremes occur, its viability declines and delivery should occur within 24 hours from harvest. Sod Viability: Sod shall not be harvested or transplanted under drought conditions.