Specifications include, but are not limited to: The Scope of Work for this contract shall include, but is not limited to new sidewalks, new and replacement wheelchair ramps, removing and replacing curb and gutter, and driveways. The locations of work shall be on residential, collector, and arterial streets in all council zones throughout the city. All sidewalk and ramp construction shall meet the current PROWAG and City of Springfield Public Works Design Standards. One, or a combination of more than one, of the work items described herein may be required to be performed at any given site pursuant to the requirements of the work required at the site. Specific projects will be provided to the contractor as they arise. All pricing of items listed on the bid form shall include all supervision, labor, materials, tools, equipment, mobilization, and all other costs required to construct the work in accordance with the contract documents.