Specifications include, but are not limited to: A new pedestrian crosswalk and signal at Dressel Elementary School on Musick Avenue, school zone beacons and a short sidewalk connection to Crecelius Drive. Specific consultant scope items include: • Preliminary Plans • Right-of-Way Plans • Final Plans • Job Special Provisions • Construction Estimates • Coordination with the Metropolitan Sewer District-MSD (if necessary) • Utility Coordination (if necessary) • Miscellaneous Pick-Up Survey Work (as necessary) • Sidewalk/Roadway Design • Traffic Signal and Beacon Design • Geotechnical Investigation (if necessary) • Subsurface Utility Investigation (if necessary) • Drainage Structure Design (if necessary) • Water Quality Design (if necessary)