Specifications include, but are not limited to: DAILY REQUIREMENTS: The contractor shall perform the following tasks on a daily basis (Monday through Friday). Empty all wastebaskets and deposit the trash into appropriate waste disposal containers. Replace plastic liners as needed. Clean all kitchen and break rooms including washing and disinfecting all hard surfaces. Clean and disinfect sinks. Clean and disinfect drinking fountains. Clean toilet bowls and seats, urinals, hand basins, counter tops, showers, and the walls around these fixtures. Clean all restroom mirrors, bright work, chrome pipes, and fittings. Thoroughly vacuum all carpet, with special attention on all entrance and exit rugs/mats, clerical areas, mailroom, copier areas, and heavily trafficked areas to remove all debris. As stains appear, spot clean the carpet. Thoroughly sweep all hard surface floors, with special attention on the entryway, airlocks, reception area, and dock areas - if applicable, to give a clean and satisfactory appearance. Thoroughly dry mop all hard wood floors to give a clean appearance. Thoroughly wet mop all hard surface floors, as needed, to give a clean and satisfactory appearance. Wet mop all break room and restroom floors using a disinfectant. Clean restroom stall partitions, doors, door frames, and push plates (all sides). Dust or wipe all horizontal surfaces. Empty and clean (inside and out) all restroom, break rooms, coffee bars, and lobby trash containers and disposals; change liners daily. Replace all sanitary napkin receptacle liners. Restock restroom dispensers to normal limits (soap, toilet tissue, paper towels). Wash all conference and break room tables as needed. Sift sand and remove cigarette butts from all smoking receptacles outside the building(s). Replace sand when it becomes discolored. Clean both sides of interior and exterior door glass, clean door glass frames and accompanying glass panels including transoms (inside and outside), removing all fingerprints and dirt. Spot clean all interior glass. Clean janitorial closets after completion of the daily tasks and before exiting the building(s). Address any and all related and conditional janitorial cleaning issues which may arise, including but not limited to restrooms requiring deep cleaning measures, accidental spilling of any office materials or supplies and substandard, deficient or incomplete services. Remove full recycle bins to designated pick-up areas and replace with empty recycle bins, if applicable. Report any and all damage found. WEEKLY REQUIREMENTS: The contractor shall perform the following tasks at least one (1) time per week. Thoroughly wash, clean, and disinfect all wastebaskets, as needed. When necessary, replace contractor-provided rugs/mats. Remove all trash and debris from the outside perimeter of the building(s), including parking lot(s). Sweep sidewalks ten feet (10’) from all entrances/exits. Pour five (5) gallons of water down each floor drain. Spot clean all elevator walls and both sides of elevator doors. Thoroughly clean toilet bowl plunger holders. Using a damp, treated cloth, wipe all flat surfaces including, but not limited to, file cabinets, conference tables and stands, bookshelves, coat racks, windowsills, handrails, cubicle partition bases and tops, etc. Clean the tops, fronts, and sides of all vending machines. MONTHLY REQUIREMENTS: The contractor shall perform the following tasks one (1) time per month, within the first ten (10) consecutive work days of each month. Damp mop and thoroughly machine scrub all finished floor areas, removing all scuffs and black marks. Clean and disinfect all walls, baseboards, doors, frames, partition surfaces, light switches when required, light fixtures, as needed, to remove insects, dirt, etc., in and on the fixtures, and remove cobwebs from all ceilings, doors and corners within the building(s). Clean/dust all venetian/mini-blinds. Clean/vacuum all vents and air diffusers (supply and return).