Specifications include, but are not limited to: A material list of all components necessary for complete restoration of the exterior of the structure. Provide and install new tiles and damaged tiles as required. Damaged tiles to be replaced consist of cracks, holes, chips, etc. New tiles will replicate existing tiles as much as possible and must be approved by park department staff prior to installation. Replace or repair all tuck-pointing as required. New tuck-pointing to duplicate existing composition, color, etc. Design, fabricate, and install all metal components including galvanized metal chute and roof structure per pictures attached with the RFP. Installation method to attach metal components to the silo and gauge of steel to be provided. Submit an alternate cost to provide a standing seam metal roof to duplicate the adjacent existing restroom structure in design and color. Wind load of ultimate wind speed of 105 MPH (or nominal wind speed of 81-82 MPH) for roof structures. Time for completion after receiving notice to proceed. Provide warranty terms for materials and workmanship.