Specifications include, but are not limited to: Task 1- Project Administration, Management, and Quality Throughout all tasks, the Engineer shall provide project administration and management activities such as staffing, sub-consultant coordination, budget management, schedule management, and coordination with City staff. The Engineer shall maintain the quality of the work products defined within this scope as consistent with applicable standards and City’s expectations. Engineer shall provide the following: A. Prepare for and attend a project kickoff meeting. B. Identify potential risks to the project’s success and develop mitigating strategies. C. Prepare and submit monthly status reports including current status of project tasks, updated project schedule, and project financials. D. Schedule and attend milestone based progress meetings during design and construction to review project status. E. Provide summaries following all project meetings. F. Prepare project maps from GIS data and other publically available information for use in project planning. G. Provide a preliminary layout for the treatment facility. H. Provide a Technical Memorandum summarizing the results of the field reconnaissance and other preliminary considerations and a concept recommendations for review and approval by City. Task 2- Field Surveys and Investigations A detailed field and boundary survey shall be conducted on the site and approved by City under Task 1. Field surveys shall be conducted primarily on City owned property and other areas where additional detail is needed and shall include the following at a minimum: Topographic and Planimetric Survey. Engineer shall provide planimetric and topographic survey work and create a topographic base file for use in the project design, permitting, and contract document preparation. Surveying will generally encompass: A. Field survey the project site. B. Coordination for the location of underground utilities and indication of the type and location of both underground and above ground utilities based on available information. C. Location of property corners adjacent to or within the survey site.