Specifications include, but are not limited to: Modify the existing filter controls for the water treatment plant. Furnish and install two (2) new Filter Control Panels with associated PLC controls to replace the existing pneumatic controls. Provide the services of the City’s authorized System Integrator for configuration and programming of the controls, including integration of the new filter controls into the overall plant SCADA. Remove existing pneumatic valves and other devices from the piping in the pipe gallery below the filter level. Install owner-furnished electric-actuated valves to replace the existing pneumatic valves. Furnish and install selected blocking valves, valve status switches, and other devices in the piping as indicated on the project drawings and specifications. Make piping modifications, including replacement of gaskets and bolts for any piping joints that need to be disassembled, as a part of the above removal and installation. Replace all bolts in the pipe gallery piping for all piping joints that do not otherwise need to be disassembled. Furnish and install eight (8) new magnetic flowmeters as indicated on the project drawings and specifications. Furnish and install other miscellaneous piping modifications at the pipe gallery level as indicated on the project drawings and specifications and as required to complete the scope of work.