Specifications include, but are not limited to: A. Contractors shall complete painting projects to include but not limited to classrooms, hallways, stairwells, cafeterias, kitchens, gyms, and, restrooms. Projects will be provided and directed by SLPS Project Manager/designee. B. Contractor shall comply in all respects with any and all applicable federal, state, and local codes, laws, regulations, and ordinances. Any fees required for permits or inspections shall be paid for by the contractor at no additional cost to the Owner. C. Examine surfaces thoroughly to determine suitability for primer and or paint. D. Immediately notify the Project Manager/designee upon discovery of any suspect condition that could potentially cause a faulty work. Do not proceed with work unless the Project Manager/designee has granted written permission to proceed regarding the suspect conditions. E. Ensure that all applicable manufacturers’ preparation requirements, including the ambient temperature and relative humidity are strictly adhered to.