Specifications include, but are not limited to: Job J4S3302 Route E CASS County. Resurface from the Jackson County line to MO 58, the total length of improvement being 5.708 miles.****(2): Job J4S3309 Route BB JACKSON County. Resurface from Route 24 to Duncan Ave, the total length of improvement being 6.502 miles.****(3): Job J4S3310 Route BB JACKSON County. Resurface from 31st Street to Route 50, the total length of improvement being 7.789 miles.****(4): Job J4S3314 Route F JACKSON County. Resurface from 31st Street to Route 50, the total length of improvement being 8.868 miles. SHAPING SLOPES, CLASS III MISC. PERMANENT AGGREGATE EDGE TREATMENT GRAVEL (A) OR CRUSHED STONE (B) BITUMINOUS PAVEMENT MIXTURE PG64-22 (SURFACE LEVELING) TACK COAT