Specifications include, but are not limited to: The scope of work for this project is to provide asphalt pavement repair on an as needed basis in response to sudden occurrences, such as physical damage by the elements, or as a result of wear and tear. The work will be prescribed through individual Job Orders issued to the contractor by the engineer for each work location. The work location limits shall be designated by the engineer in the Job Order as stated herein. A work location may include multiple repair areas, but shall not have gaps between individual repairs that exceed three miles in length. Gaps between individual repairs that exceed three (3) miles in length shall constitute separate work locations unless both parties agree to waive this limitation. For divided highways, the work location shall be limited to one direction unless there are non-emergency median openings or interchanges that allow movement of equipment to additional repairs in the opposing lanes such that the length of travel does not exceed three (3) miles in length. The project limits for the work will be along I-70 in Montgomery and Warren Counties, including the interchange ramps. Job Orders will only be issued for work to be performed from April 1 to November 30, unless otherwise mutually agreed upon between the contractor and the engineer.