Specifications include, but are not limited to: The proposed work includes the renovation of a multi-story building. Architectural, mechanical, electrical, plumbing, HVAC, structural, IT/telecommunication and civil/site modifications will be made to the building and site. First and second story additions, renovations of existing floor spaces and the installation of an elevator are a few of the major modifications. The contractor will be responsible for providing necessary material and labor to complete the project in a timely manner in accordance with the Project Manual, Plan Drawings and other Contract Documents. The contractor will be responsible for arranging delivery of materials to the job site. The bid shall also include disposal of all waste and demolition material.