Specifications include, but are not limited to: Construction of potable water transmission main, storage tank and booster pumping station. • The waterline extension’s main items of work shall consist of the installation of approximately 1,650 linear feet of six (6) inch ductile iron pipe, approximately 4,450 linear feet of ten (10) inch ductile iron pipe, fittings, fire hydrants, valves and one connection to an existing six (6) inch ductile iron water main. • The booster pumping station’s main items of work shall consist of the installation of two (2) 500 gpm booster pumps, valves, piping, fittings, electrical and control system, one (1) 60,000 gal storage tank and one (1) 20,000 hydro pneumatic tank system with air compressor. • The project includes furnishing all labor, equipment, tools, and materials necessary to construct the project, complete-in-place and functional, as shown on the Plans and Specifications.