Specifications include, but are not limited to: The Contractor will provide and be responsible for personnel, vessels and/or barges, equipment and machinery necessary for the transfer of oysters as directed by the MDMR. The Contractor will load and deploy oysters only in areas designated by the MDMR and at the times allocated by the MDMR for such activities; The Contractor will load a minimum of 3,000 sacks of oysters from oyster boats onto the Contractor's vessels or barges which will be located at Pascagoula, and then transport those oysters to a destination or destinations as determined by the MDMR. The Contractor will deploy the oysters evenly over the areas designated by the MDMR; The Contractor will transport oysters to deployment areas on barges or vessels that are loaded to conform to the depth of the water at the deployment sites so as to not draw more than five feet of water; The Contractor will utilize a grid pattern in deployment so as to accomplish a uniform distribution of the material to the density determined by MDMR personnel; The Contractor agrees that at no time will the deploying barge and tug disburse the oysters over previously deployed areas unless authorized to do so by MDMR personnel; The Contractor agrees that a tugboat used to disburse the oysters shall not push or pull more than one loaded barge at a time during transfer and deployment, so as to ensure proper maneuverability; The Contractor will disburse the oysters in a thin, even layer;