Specifications include, but are not limited to: The successful contractor will be required to perform the following services: 2.2.1 Collect all solid waste from the Mississippi Department of Human Services (MDHS) designated locations identified below and dispose of it in a landfill, recycle facility or other waste disposal site. Contractor must provide and place at MDHS designated locations the receptacles described below, into which persons may deposit solid waste. 2.2.2 Contractor must retrieve such receptacles when notified by MDHS, haul them to a landfill, recycle facility or waste disposal site, empty the contents and then return the empty receptacles to MDHS designated locations. Contractor must retrieve, haul and empty said receptacles when requested by MDHS, except as stated below. If MDHS requests a pickup before 2:00 P.M., Contractor will make that haul the same day; if the request is made after 2:00 P.M., Contractor will make the haul by noon the following day. 2.2.3 In the event MDHS requires additional receptacles beyond the scope provided herein, MDHS will provide Contractor at least 24 hours’ notice to provide one (1) 30 cubic yard roll-off dumpster or any other size receptacle to requested MDHS location within 24 hours of MDHS request. 2.2.4 MDHS will not deposit any hazardous or toxic materials into said trash receptacles and Contractor shall have no responsibility to collect, or dispose of, such materials. 2.2.5 Contractor shall dispose of all waste materials only at a duly licensed and permitted landfill, recycle facility or waste disposal site that meets or exceeds all applicable local, state, and federal laws, ordinances, rules and regulations. 2.2.6 Contractor will retrieve and empty the contents of the trash receptacles at each respective MDHS location and at the frequency for each location as identified and described in Section 12. In the event of a collection date falling on a holiday, scheduled waste collections must be provided on either the day prior to or a day succeeding the established scheduled collection day. 2.2.7 Contractor shall maintain the area around the receptacles at each MDHS designated location by collecting over flowing materials. 2.2.8 Contractor shall conduct regular maintenance of receptacles at each MDHS designated location to ensure that receptacles are clean and in serviceable condition at all times during the entire term of the contract. Contractor shall steam clean receptacles when appropriate or as requested by MDHS. Contractor shall repair or replace damaged receptacles within three (3) days of MDHS notifying Contractor of damaged or malfunctioning receptacles. MDHS Staff will examine receptacles and evaluate service performance to ensure services are properly rendered. 2.2.9 Contractor is responsible for any permits, licenses, or fees required to perform the services described herein.